PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilling inside Stair -2 Facing West (800x600).jpg Installing rebar mats at Elev. 4 (4th Floor) Facing South (800x600).jpg Conduit at Elev. 1,2,3 Facing East (800x600).jpg Constructing shear wall panels for Stair -4 (3rd Floor) Facing North-East (800x600).jpg Constructing the shear wall panels for Stair -4 (3rd Floor) Facing North-East (800x600).jpg Electrical pipes running to the Electrical Room (152) Facing South-East (800x600).jpg Finished installing Stair -5. These stairs go to the UCIA space. Facing North-West (800x600).jpg Installed 1-4 gravel inside Stair -2 Facing West (800x600).jpg
Previous pageNext page Constructing shear wall panels for Stair -4 (3rd Floor) Facing North-East (800x600)
Constructing shear wall panels for Stair -4 (3rd Floor) Facing North-East (800x600)